Lenox Road Corridor Study

The Buckhead REdeFINED study will be integrated with the Lenox Road Corridor Study. The Buckhead CID has requested funding from the Atlanta Regional Commission to assist us in determining the feasibility of pedestrian, bicycle and roadway improvements on Lenox Road starting at the Lenox MARTA Station and heading to Piedmont Road. The intent is to tie together two MARTA Stations with Peachtree Road, PATH 400 and corridor improvements planning along Piedmont Road. Click here for more information.

Do you have specific feedback about this project? Send it to us below!


Lenox Road Charrette

November 28th – 30th, 2016

9:00 AM – 4:00 PM

As part of the Lenox Road Corridor Study, the design team will be hosting a three-day charrette on the corridor. Charrettes are interactive design workshops where we can work collaboratively with a variety of disciplines, get instant feedback on design ideas, and accelerate the planning process. These formats also offer opportunities to engage the public and stakeholders.  The public is welcome to visit the charrette to see what is being planned for Lenox Road.

Location: Two Alliance Center @ 3560 Lenox Road. The charrette will be in the lobby area known as the Verve Lounge.